ABOUT THE PROYECT

TIGER GRANT PROPOSAL DOCUMENTS

- ARRA Certification and Project Summary
- PAA General Site Plan (including Proposed Phase III-D)

- PAA Puerto Viejo Access Road Detail
- Pier 8 Rehabilitation Detail


STUDIES

Ocean Shippping Consultants, a British consulting firm, conducted the market study for the Port of the Americas.

The Project's approval required the preparation of a local Environmental Impact Statement (EIS) that was approved by the Environmental Quality Board (EQB), as well as a similar document required by the federal government which was approved by the Corps of Engineers. In addition, the Project requires permits from the Corps of Engineers for (1.) the dredging of the Bay of Ponce (which started in June 2005), (2.) the disposition of the dredged sediments in the ocean, and (3.) the construction of the terminal (first phase completes in 2004), in addition to requiring a Water Quality Certification from the EQB and an endorsement from the Planning Board's Coastal Zone Program.

A list of the environmental studies that have been conducted:
- Sediment characterization of Ponce Bay
- Evaluation of the marine disposal zone for sediments that will be the product of the dredging
- Turbidity study
- Soil quality
- Identification of flora and fauna
- Mangroves
- Land and marine archeology
- Marine and land traffic study
- Noise generation study
- Social-Economic Study and Environmental Justice
- Marine current

Ponce Bay Water Quality
Monitoring Report
- June-December, 2006 (Aprox. 4MB)
- January-July, 2006 (Aprox. 6 MB)
- August-December, 2005 (Aprox. 4MB)

Water Quality Monitoring Report
August, 2005 - November, 2006
- PTA MWP Technical Report I (522 KB)
- PTA MWP Technical Report II (532 KB)
- PTA MWP Technical Report III (519 KB)
- PTA MWP Technical Report IV (516 KB)
- PTA MWP Technical Report V ( 516 KB)
- PTA MWP Technical Report VI (517 KB)
- PTA MWP Technical Report VII (Aprox. 1.2 MB)
- PTA MWP Technical Report VIII (519 KB)
- PTA MWP Technical Report IX (748 KB)
- PTA MWP Technical Report X (839 KB)
- PTA MWP Technical Report XI (Aprox. 1.9 MB)
- PTA MWP Technical Report XII (Aprox. 1.3 MB)
- PTA MWP Technical Report XIII (Aprox. 2.2 MB)
- PTA MWP Technical Report XIV (Aprox. 3.3 MB)
- PTA MWP Technical Report XV (Aprox. 1.6 MB)
- PTA MWP Technical Report XVI (Aprox. 6.5 MB)
- PTA MWP Technical Report XVII (291KB)

Environmental Quality Board (JCA) Documents
- APA
Water Quality Certificate/ Aug., 2004
- APA DIAF Resolution / May, 2004

Planning Board Documents
- Location Query 10 Ext. / Sep., 2004
- Location Query 9 Ext. / Aug., 2004
- Location Query 8Ext. / Jun., 2004
- Federal Consistency Certification May, 2004

Historic Preservation Office Documents
- Historic Preservation Office Certification / Aug., 2004

U.S. Army Corps of Engineers Documents
- Corps of Engineers Permit / Feb., 2005
- Municipality of Ponce Coop. Agreement / Apr., 1988

ENVIRONMENTAL IMPACT SATEMENT

The Environmental Impact Statement has been divided into a number files that vary in size. In order to open them you need the Adobe Acrobat Reader. The time needed to open the files will depend on the speed and quality of your Internet connection.

Preliminary Environmental Impact Statement
(February, 2003)

Part 1 (260 KB)
Part 2 (10.4 MB)
Part 3 (86.2 KB)
Part 4 (13.2 MB)
Part 5 (4.3 MB)
Part 6 (2.4 MB)
Part 7 (10.3 MB)

Environmental Impact Statement Amendment
(October, 2003)

Amendment (4.1 MB)
Appendix A (4.3 MB)
Appendix B (1.4 MB)
Appendix C (8.1 MB)
Appendix D (2.0 MB)
Appendix E (8.5 MB)
Appendix F (85.4 MB)

Section updated: September, 2009